Professional services provided
Projects and work supervisions in the south of Italy-
Regione Basilicata
- CONSORZIO DI BONIFICA BRADANO E METAPONTO - (MT)
1. Scanzano, Policoro and Nova Siri Irrigation Network ConstructionYear Task Stage Details 1958 Design and consultancy Constructed Prefabricated buildings Year Task Stage value of works Details 1979 Preliminary design Approved It. Lire 90 b Irrigational area: Ha 8.000 1983 Detailed design It. Lire 45 b Clients: Maggiò, Zecchina and other contractors Year Task Stage value of works Details 1978-86 Detailed designs and consultancies Constructed and operative
3.1. Sinni Aqueduct irrigation network.
Detailed design and working plan; Client: building contractors.
Consorzio Metaponto 1): area A, districts 1, 3 e 4 across 4.500 Ha; 1978-80
Operative.
3.2. Draining pump irrigation networks upgrading
Consultancy; 1983-86
3.3. Sinni Aqueduct irrigation network connections upgrading ("white" areas).
Consultancy and project; 1979-83. - CONSORZIO DI BONIFICA DELL'ALTA VAL D'AGRI - (PZ)
1. Pertusillo Aqueduct - Downhill AreaYear Task Stage value of works Details 1984 Detailed design Constructed and operative It. Lire 15 b Pipes: DN 1400-1200 mm; Length: km 15 Year Task Stage value of works Details 1984 Detailed design To be examined It. Lire 10 b Year Task Stage value of works Details 1987 Detailed design Constructed and operative It. Lire 10 b - MINISTERO LL.PP. PROVVEDITORATO DI CATANZARO
1. Noce River's Basin PlanYear Task Stage value of works Details 1990-92 Designs Tested in 1993 Together with Società Lotti and Studio ing. D'Alessandro (PA) - CONSORZI DI BONIFICA RAGGRUPPATI DI CATANZARO (CZ)
1. Alli-Tacina Area IrrigationYear Task Stage value of works Details 1973-76 Consultancy for the project upgrading and work supervision Constructed and operative Irrigational area: Ha 5,000 Year Task Stage value of works Details 1975-78 Detailed design Constructed and operative It. Lire 45 b Irrigational area: Ha 11,000
lot I : It. Lire 6.148.000.000;
lot II : It. Lire 9.032.000.000:
lot III: including draining network management It. Lire 12,993 bilion;
lot IV: including draining network management Italian Lire 13,587 bilion.
3. Crocchio Stream Intake WorkYear Task Stage value of works Details 1975 Design, consultancy Constructed and operative It. Lire 362 m Year Task Stage value of works Details 1978 Consultancy Constructed and operative It. Lire 45 b Client: Farsura Year Task Stage value of works Details 1974 Detailed design, consultancy for the water works Constructed and operative It. Lire 45 b Irrigational area: Ha 1,200 Year Task Stage value of works Details 1974 Detailed design, consultancy for the water works Constructed and operative It. Lire 1,907 b Discharge: 2 mc/s Year Task Stage value of works Details 1974 Detailed design, consultancy for the work supervision Constructed and operative It. Lire 4,8 b Irrigational area: Ha 5,000 Year Task Stage value of works Details 1974 Detailed design, consultancy for the work supervision Constructed and operative It. Lire 2,755 b Irrigational area: Ha 1,200 Year Task Stage value of works Details 1980-91 Preliminary design Team work Year Task Stage value of works Details 1984-87 It. Lire 5 b
Detailed design; 1998
Project security coordination 1999;
Test to be completed.
11. Angitola and Melito Dams: Flood Risk Studies(DAMBREAK)
11.1 DAMBREAK Angitola: 1998
11.2 DAMBREAK Melito: 2006
12. Alli-Tacina and Alli-Copanello Irrigation SystemYear Task Stage value of works Details 2001-06 Detailed designs, studies ε 22 m Works: weirs, intake works, Simeri river desilting basin (320,000 m3)
12.1 Detailed design: 2001-2002.
12.2 Environmental impact analysis: 2003.
12.3 Working lot at 152 a.s.l. - detailed design: 2003-2004;
value of works € 14 milioni; tendered for in 2004 and under construction.
12.4 Completion lot at 119 a.s.l. - detailed design: 2005;
Value of works € 6 m; to be examined by SIIT (nov. 2006). - CONSORZIO DI BONIFICA DELLA VALLE DEL LAO - (CS)
1. River Lao's Left Bank Area IrrigationYear Task Stage value of works Details 1968 Work direction, consultancy for the detailed design Constructed and operative Irrigational area: Ha 1,000 Year Task Stage value of works Details 1970 Works direction, detailed design Constructed and operative It. Lire 1 b Irrigational area: Ha 700 Year Task Stage value of works Details 1970-72 Detailed design, consultancy for the works Constructed and operative Year Task Stage value of works Details 1971 Detailed design It. Lire 1,6 b Irrigational area: Ha 700 - CONSORZIO DI BONIFICA VELIA - (SA)
1. Palistro Irrigation Networks: Lots I and IIYear Task Stage value of works Details 1976-77 and 1986-89 Detailed design - consultancy for testing stage Constructed and operative It. Lire 2 b Irrigational area: Ha 600 Year Task Stage value of works Details 1978 Detailed design, consultancy for the work supervision Constructed and operative Irrigational area: Ha 500 Year Task Stage value of works Details 1979-88 Detailed design Approved It. Lire 40 b Irrigational area: Ha 3,000
Consultancies.
5. Badolato-Palistro Irrigation Scheme Completion and Remote Control System
Project: 1986-88. - CONSORZIO FONDARIO DI VALLO DELLA LUCANIA - (SA)
1. Carmine Dam and Torna Stream Irrigation SystemYear Task Stage value of works Details 1978 and 1982-88 Detailed design, consultancy for the work supervision Constructed and operative Irrigational area: Ha 1,000 - CONSORZIO AURUNCO DI DI BONIFICA - SESSA AURUNCA
1. Irrigation Network ExpansionYear Task Stage value of works Details consultancy Irrigational area: Ha 6,500 Year Task Stage value of works Details 1971 Detailed design, consultancy It. Lire 600 m - CONSORZIO DI BONIFICA DEL SANNIO ALIFANO - (CE)
1. Volturno River Weir and Conduction Canal's First ReachYear Task Stage value of works Details 1953-62 Design, work direction Constructed and operative It. Lire 1 b With Prof. Eng. F, Lotti Year Task Stage value of works Details 1960 Detailed design Constructed and operative It. Lire 1,2 b Irrigational area: Ha 1,100
Project Implementation Details:
3.1. Lot II - including canals (1.200 Ha - Italian Lire 600 m)
Detailed design; 1962;
Constructed and operative.
3.2. Lot III - sprinkling system (1.000 Ha - Italian Lire 1,5 billion)
Detailed design - work supervision consultancy; 1962-1976
Constructed and operative.
4. Volturno River's Left Bank Irrigation System Construction, Expansion and Development
4.1 - lot II - sub-lot I (distribution network).
Detailed design; client: Cidonio contractor; 1964.
Operative.
4.2 - lot IV, Gioia-S. Simeone districts (600 Ha) (Italian Lire 400 m)
Detailed design; 1968 -
Operative.
4.3 - lot V, Surge works for the uphill area (Italian Lire 300 m).
Detailed design; 1969 -
Operative,
4.4 - lot VI, Main distribution canal upgrading (Italian Lire 300 m.)
Detailed design and work direction; 1970
Operative.
5. Alifana plain uphill water management plan (Italian Lire 4 billion).
Preliminary design; 1969
6. Volturno river's left branches management
Detailed design and consultancy; 1972-76
Operative.
7. Volturno river's left branches management (It. Lire 3,5 b.)
Detailed design and consultancy; 1972-1976
Operative. - IN.CO.MIR spa
Calore Irpino River Water Management Preliminary design; 1988. - SOC. ENRIN 2000 - Napoli
Hydroelectric Exploitation of Simeri, Savuto and Tronto Rivers Irrigation CanalsYear Task Stage value of works Details 1990-93 Feasibility design - CONSORZIO DI BONIFICA IN SX TRIGNO E DEL SINELLO (CH)
1. Area Irrigation - General and Expansion PlanYear Task Stage value of works Details 1951 Public works reliminary design Constructed and operative - CONSORZIO DI BONIFICA DEL BASSO MOLISE - (CB)
2. Low Molise Irrigation, with Water Conducion from Ponte Liscio DamYear Task Stage value of works Details 1962 Preliminary design Approved, partly constructed and operative It. Lire: 13 b With Prof. Arredi and eng. Scalfati. Irrigational area: Ha 20,000 - CASSA PER IL MEZZOGIORNO - P.S. 14
1) Sinni Aqueduct Support SructuresYear Task Stage value of works Details 1976 Consultancy Approved Year Task Stage value of works Details 1976 Consultancy Consultancy for a reach of the aqueduct
Project implementation details:
3.1. Hydrological studies (streams Sauro and Medio Agri)
Preliminary design for Soc. SPEA; 1979
3.2. Detailed design of the whole plan and particularly of the intake and conduction works; works consultancy; Works direction of the reach granted to Del Favero - Maggiò group (It. L. 80 b); 1983-94
Partially operative.
4) Sinni aqueduct regulation workYear Task Stage value of works Details 1983-86 Consultancy It. Lire: 36 b Client: Casmez Alta Sorveglianza
hydrological and hydraulic studies; 1983-84
6) Pertusillo Irrigational Aqueduct
Project implementation details:
6.1. Preliminary design of Agri valley area and high Metaponto plain water supply system (4,1 mc/s) - italian Lire 100 b - 1983;
6.2. Detailed design of lot I - It. L. 30 b - 1983
Application accomplished. A variant model realized and granted to the designer through Consorzio Alta Val d'Agri (see A.26) - ANAS COMPARTIMENTO DI BARI
S.S. 106 Expansion - lot IIIYear Task Stage value of works Details 1990-91 Hydraulic management Constructed and operative Client: Impresa Castelli - CONSORZIO DI BONIFICA DELL'ARNEO - NARDO' (LE)
1. Sinni Aqueduct and Sinni-Salento Irrigation Scheme
1.1. Sinni Aqueduct: Salento Irrigation Scheme, reach IV, 150.000 Ha, value of project It. Lire 3.100 m
Preliminary design, with prof. V. Cotecchia; 1979-1988
To be examined.
1.2. Sinni aqueduct: Salento irrigation scheme, reach IV, lot I (DN 3000 mm)
Detailed design, with prof. V. Cotecchia; 1981; It. L. 40 b
Operative.
1.3. Sinni aqueduct: Salento irrigation scheme, reach IV, Chidro spring surge works (2 mc/s)
Detailed design, with the Conzorzio's technical practice; 1982; It. L. 10 b
Operative.
1.4. Sinni-Salento irrigation scheme, lot I (F.I.O.)
Consultancy for the works, with prof. Cotecchia (It. L. 125 b)
Granted to Vianini contractor, Rome.
1.5. Sinni-Salento irrigation, lot II
Detailed design coordination and project with others (It. L. 140 b); consultancy for Sava basin and other works; (also with Impresa Vianini as client)
Operative.
1.6. Sinni-Salento irrigation, lot III
Detailed design coordination; project, with others (It. L. 150 b), consultancy
(also with Impresa Vianini as client)
Operative.
1.7. Sinni aqueduct: Salento irrigation scheme, Monteparano branch point (It. L. 3 b)
Detailed design, with Consorzio's technical practice; 1984
Operative. - ENTE IRRIGAZIONE PUGLIA E LUCANIA - (BA)
Sinni Aqueduct: Montecotugno DamYear Task Stage value of works Details 1977-83 Work supervision Constructed and operative It. Lire 65 B - pipelines supply excluded Reach VI-V26 and Sinni-Agri; Valsinni tunnel; by pass - CONSORZIO DI BONIFICA STORNARA E TARA - (TA)
1. Tara Area: S. Giuliano Dam Irrigation SchemeYear Task Stage value of works Details 1969 Working plan Constructed and operative Client: Impresa Della Morte Year Task Stage value of works Details 1983 Detailed design To be examined Irrigational area: Ha 600 1984 Preliminary design Irrigational area: Ha 1,500 Year Task Stage value of works Details Detailed design Approved It. Lire: 8 b Parcelled out in 3 lots Year Task Stage value of works Details 1982-88 Preliminary design; hydrological study Programmatic plan approved with Law 183/89 It. Lire: 80 b - CONSORZIO DI BONIFICA CAPITANATA - (FO)
1. Muschiatura Marsh Land ReclamationYear Task Stage value of works Details 1952 Detailed design It. Lire: 100 m With: Soc. SIAF Year Task Stage value of works Details 1960 Preliminary design It. Lire: 1 b With: Prof. Arredi - CONSORZIO DI IMPRESE METAPONTO 1 - P.S. 14 DELLA CASMEZ
1) Metaponto Area Irrigation Network - "A" districts 1, 3, 4, Water Supplied by Sinni AqueductYear Task Stage value of works Details 1976 Detailed design Constructed and operative Irrigational area: Ha 4,500 Year Task Stage value of works Details 1976 Design Approved It. Lire: 36 b Irrigational area: Ha 13,500 - ENTE RIFORMA PUGLIA E LUCANIA - (BA)
Taranto District Land Reclamation General Plan - Public WorksYear Task Stage value of works Details 1951 Preliminary design - OPERE PUBBLICHE S.p.A. (CAGLIARI)
S. Elia Stadium's Car Park - Civil Engineering WorksYear Task Stage Value of works Details 1990 Detailed design Constructed and operative Area: Ha 20 Italia '90 World Football Championship - CONSORZI RIUNITI DELLA SARDEGNA MERIDIONALE - (CA)
1. Su Pauli Land Reclamation (Villamar)Year Task Stage Value of works Details 1962 Design Constructed and operative It. Lire 60 m Year Task Stage Value of works Details 1966-74 Detailed design Constructed and operative It. Lire 300 m Year Task Stage Value of works Details 1994 Detailed design Project included in Q.C.S. 2000-06's plan Area: Ha 5,000 Year Task Stage Value of works Details 1993-95 Design It. Lire: 75 b Area: Ha 5,000 - CONSORZIO DI BONIFICA INTEGRALE LARINESE - (NU)
1. Cigno Stream DamYear Task Stage Value of works Details 1969 Preliminary design Approved With Scalfati, civil engineer Year Task Stage Value of works Details 1978-91 Surveys, detailed design, work supervision Suspended With Scalfati, civil engineer Year Task Stage Value of works Details 1970 Detailed design, work supervision Constructed It. Lire: 700 m Year Task Stage Value of works Details 1983-91 Detailed design - CONSORZIO DI BONIFICA DEL BASSO SULCIS - (CA)
Sprinkler System IrrigationYear Task Stage Value of works Details 1968 Detailed design Constreucted and operative It. Lire: 600 m Irrigational area: Ha 550 - CONSORZIO DI BONIFICA DEL CIXERRI - (CA)
1. Irrigation Scheme of Lot 1Year Task Stage Value of works Details 1965 Consultancy Constructed and operative Irrigational area: Ha 4,500 Client: Gariazzo contractor Year Task Stage Value of works Details 1971 Preliminary design It. Lire: 5,4 b Irrigational area: Ha 4,500 - CONSORZIO DI BONIFICA DEL CAMPIDANO DI TERRALBA (NU)
1. Lot I: Irrigation, Land Reclamation and RoadwayYear Task Stage Value of works Details 1969 Work supervision Constructed and operative It. Lire: 600 m Irrigational area: Ha 600 Year Task Stage Value of works Details 1970 Design, work direction Operative It. Lire: 250 m Year Task Stage Value of works Details 1970 Design, work direction Operative It. Lire: 130 m Year Task Stage Value of works Details 1971-86 Detailed design Constructed and operative It. Lire: 29 b Area: Ha 3,500 With Scalfati, civ. Eng. and Sermonti, agronomist Year Task Stage Value of works Details 1975 General plan, detailed design Operative It. Lire: 5 b - CONSORZIO DI BONIFICA DEL NUORESE - (NU)
1. Cedrino valley Irrigation: Central lotYear Task Stage Value of works Details 1971 Preliminary design It. Lire: 5,5 b Irrigational area: Ha 3,000 Year Task Stage Value of works Details 1974 Detailed design Operative It. Lire: 9 b - CONSORZIO DI BONIFICA PELAU BUONCAMMINO (NU)
1. Water ManagementYear Task Stage Value of works Details 1967 General plan Approved It. Lire: 1,4 b Year Task Stage Value of works Details 1970 Detailed design, work supervision, book-keeping Operative It. Lire: 1 b Year Task Stage Value of works Details 1972-78 Detailed design, work supervision, book-keeping Operative It. Lire: 1,6 b Year Task Stage Value of works Details 1974 Detailed design It. Lire: 150 m Year Task Stage Value of works Details 1972 Detailed designs Operative It. Lire: 300 m Year Task Stage Value of works Details 1979-86 Design Year Task Stage Value of works Details 1983-9378 Design, work direction Operative It. Lire: 1,5 b Year Task Stage Value of works Details 1994 Report - CONSORZIO DI BONIFICA DEL CAMPIDANO DI ORISTANO (OR)
1. Oristano Area Irrigation and Networks ManagementYear Task Stage Value of works Details 1973 Design Approved It. Lire: 26 b Prog. Spec. 13 Casmez Year Task Stage Value of works Details 1975 Design Operative It. Lire: 13 b Irrigational area: Ha 3,000 - SOCIETA' BONIFICHE SARDE - ARBOREA
Santa Vittoria Dam on Tirso River UpgradingYear Task Stage Value of works Details 1972 Detailed design It. Lire: 400 m - CONSORZIO INDUSTRIALE DELLA SARDEGNA CENTRALE
Cedrino Aqueduct Water Provision to Sologo Industrial AreaYear Task Stage Value of works Details 1977 Design Operative It. Lire: 6,5 b With: Tomasi, Sallusto, Coscarelli, civ. Eng. - SNAMPROGETTI SUD - DATA ENGINEERING
Porto Empedocle Industrial Port and RoadwayYear Task Stage Value of works Details 1989-90 Design Town Plan on behalf of A.S.I. Agrigento - CONSORZIO DI BONIFICA DELLA PIANA DI CATANIA - (CT)
1. Catania Plain Irrigation NetworkYear Task Stage Value of works Details 1958 Detailed design, consultancy Operative Irrigational area: Ha 3,000 Client: Impresa Cidonio Year Task Stage Value of works Details 1969 Consultancy Operative Irrigational area: Ha 25,000
Regione Calabria
Regione Campania
Regione Molise
Regione Puglia
Regione Sardegna
Regione Sicilia
1956 - 2024: 68 years
experience in water engineering
Complete geographical list
CESECO INTERNATIONAL s.r.l. - Professional and consulting services
Water engineering consulting firm in Rome, hydroelectric plants, dams and weirs, aqueducts and sewages
Via Lugnano in Teverina 9 - 00181 Roma | Tel.: +0039 06/7811891 | Fax: +0039 06/7801129 | e-mail: ceseco@ceseco-int.it
Water engineering consulting firm in Rome, hydroelectric plants, dams and weirs, aqueducts and sewages
Via Lugnano in Teverina 9 - 00181 Roma | Tel.: +0039 06/7811891 | Fax: +0039 06/7801129 | e-mail: ceseco@ceseco-int.it