Professional services provided

Projects and work supervisions in the south of Italy
engineering consulting firm in rome
    Regione Basilicata
  1. CONSORZIO DI BONIFICA BRADANO E METAPONTO - (MT)
    1. Scanzano, Policoro and Nova Siri Irrigation Network Construction
    Year Task Stage Details
    1958 Design and consultancy Constructed Prefabricated buildings
    2. Metaponto Plain Full Pipes Irrigation Network Upgrading (8.000 Ha)
    Year Task Stage value of works Details
    1979 Preliminary design Approved It. Lire 90 b Irrigational area: Ha 8.000
    1983 Detailed design   It. Lire 45 b Clients: Maggiò, Zecchina and other contractors
      3. Sinni Aqueduct Irrigation Network Upgrading.
    Year Task Stage value of works Details
    1978-86 Detailed designs and consultancies Constructed and operative    
      Project implementation details:
    3.1. Sinni Aqueduct irrigation network.
    Detailed design and working plan; Client: building contractors.
    Consorzio Metaponto 1): area A, districts 1, 3 e 4 across 4.500 Ha; 1978-80
    Operative.
    3.2. Draining pump irrigation networks upgrading
    Consultancy; 1983-86
    3.3. Sinni Aqueduct irrigation network connections upgrading ("white" areas).
    Consultancy and project; 1979-83.
  2. CONSORZIO DI BONIFICA DELL'ALTA VAL D'AGRI - (PZ)
    1. Pertusillo Aqueduct - Downhill Area
    Year Task Stage value of works Details
    1984 Detailed design Constructed and operative It. Lire 15 b Pipes: DN 1400-1200 mm; Length: km 15
      2. "High" Pertusillo irrigation aqueduct - Uphill Area
    Year Task Stage value of works Details
    1984 Detailed design To be examined It. Lire 10 b  
      3. Management and Expansion of Agri Medium Hight Valley Irrigation Network.
    Year Task Stage value of works Details
    1987 Detailed design Constructed and operative It. Lire 10 b  

  3. Regione Calabria
  4. MINISTERO LL.PP. PROVVEDITORATO DI CATANZARO
    1. Noce River's Basin Plan
    Year Task Stage value of works Details
    1990-92 Designs Tested in 1993   Together with Società Lotti and Studio ing. D'Alessandro (PA)
  5. CONSORZI DI BONIFICA RAGGRUPPATI DI CATANZARO (CZ)
    1. Alli-Tacina Area Irrigation
    Year Task Stage value of works Details
    1973-76 Consultancy for the project upgrading and work supervision Constructed and operative   Irrigational area: Ha 5,000
      2. Isola Capo Rizzuto Plateau Irrigation
    Year Task Stage value of works Details
    1975-78 Detailed design Constructed and operative It. Lire 45 b Irrigational area: Ha 11,000
    Value of works - details
    lot I : It. Lire 6.148.000.000;
    lot II : It. Lire 9.032.000.000:
    lot III: including draining network management It. Lire 12,993 bilion;
    lot IV: including draining network management Italian Lire 13,587 bilion.

      3. Crocchio Stream Intake Work
    Year Task Stage value of works Details
    1975 Design, consultancy Constructed and operative It. Lire 362 m  
    4. Amato Stream Outlet Canal Consolidation
    Year Task Stage value of works Details
    1978 Consultancy Constructed and operative It. Lire 45 b Client: Farsura
      5. Savuto Coastal Plain Irrigation
    Year Task Stage value of works Details
    1974 Detailed design, consultancy for the water works Constructed and operative It. Lire 45 b Irrigational area: Ha 1,200
      6. Tacina and Cape Rizzuto Valleys Irrigation Networks - Soleo Stream Intake and Conduction Works
    Year Task Stage value of works Details
    1974 Detailed design, consultancy for the water works Constructed and operative It. Lire 1,907 b Discharge: 2 mc/s
      7. Alli-Tacina River Coastal Plain Irrigation
    Year Task Stage value of works Details
    1974 Detailed design, consultancy for the work supervision Constructed and operative It. Lire 4,8 b Irrigational area: Ha 5,000
      8. S. Eufemiada Coastal Plain Irrigation on Savuto River
    Year Task Stage value of works Details
    1974 Detailed design, consultancy for the work supervision Constructed and operative It. Lire 2,755 b Irrigational area: Ha 1,200
      9. Pesipe Stream's Bed Management and Area Irrigation
    Year Task Stage value of works Details
    1980-91 Preliminary design     Team work
      10. Catanzaro District's Coastal Area Irrigation - Valle Tacina, Isola Capo Rizzuto, Alli-Tacina and Tacina-Copanello Irrigation and Remote Control System Completion
    Year Task Stage value of works Details
    1984-87     It. Lire 5 b  
    Project Implementation Details: 10.1. Isola Capo Rizzuto irrigation and remote control system completion (€  2.600.000, 00)
    Detailed design; 1998
    Project security coordination 1999;
    Test to be completed.

      11. Angitola and Melito Dams: Flood Risk Studies(DAMBREAK)
    11.1 DAMBREAK  Angitola: 1998
    11.2 DAMBREAK  Melito: 2006

    12. Alli-Tacina and Alli-Copanello Irrigation System
    Year Task Stage value of works Details
    2001-06 Detailed designs, studies   ε 22 m Works: weirs, intake works, Simeri river desilting basin (320,000 m3)
    Project Implementation Details:
    12.1 Detailed design: 2001-2002.
    12.2 Environmental impact analysis: 2003.
    12.3 Working lot at 152 a.s.l. - detailed design: 2003-2004;
    value of works € 14 milioni; tendered for in 2004 and under construction.
    12.4 Completion lot at 119 a.s.l. - detailed design: 2005;
    Value of works € 6 m; to be examined by SIIT (nov. 2006).
  6. CONSORZIO DI BONIFICA DELLA VALLE DEL LAO - (CS)
    1. River Lao's Left Bank Area Irrigation
    Year Task Stage value of works Details
    1968 Work direction, consultancy for the detailed design Constructed and operative   Irrigational area: Ha 1,000
      2. River Lao's Right Bank Area Irrigation and System Upgrading
    Year Task Stage value of works Details
    1970 Works direction, detailed design Constructed and operative It. Lire 1 b Irrigational area: Ha 700
      3. River Lao Weir (1 bilion)
    Year Task Stage value of works Details
    1970-72 Detailed design, consultancy for the works Constructed and operative    
      4. Abatemarco stream Irrigation System
    Year Task Stage value of works Details
    1971 Detailed design   It. Lire 1,6 b Irrigational area: Ha 700

  7. Regione Campania
  8. CONSORZIO DI BONIFICA VELIA - (SA)
    1. Palistro Irrigation Networks: Lots I and II
    Year Task Stage value of works Details
    1976-77 and 1986-89 Detailed design - consultancy for testing stage Constructed and operative It. Lire 2 b Irrigational area: Ha 600
      2. Alento-Badolato Hills Irrigation Network
    Year Task Stage value of works Details
    1978 Detailed design, consultancy for the work supervision Constructed and operative   Irrigational area: Ha 500
      3. Alento Valley Irrigation
    Year Task Stage value of works Details
    1979-88 Detailed design Approved It. Lire 40 b Irrigational area: Ha 3,000
      4. Alento River Management and Irrigation System.
    Consultancies.
    5. Badolato-Palistro Irrigation Scheme Completion and Remote Control System
    Project: 1986-88.
  9. CONSORZIO FONDARIO DI VALLO DELLA LUCANIA - (SA)
    1. Carmine Dam and Torna Stream Irrigation System
    Year Task Stage value of works Details
    1978 and 1982-88 Detailed design, consultancy for the work supervision Constructed and operative   Irrigational area: Ha 1,000
      2. Remote Control Management Training Course; 2 weeks; 1983.
  10. CONSORZIO AURUNCO DI DI BONIFICA - SESSA AURUNCA
    1. Irrigation Network Expansion
    Year Task Stage value of works Details
      consultancy     Irrigational area: Ha 6,500
      2. Irrigation network (Italian Lire 600 m; 1971) - consultancy and project.
    Year Task Stage value of works Details
    1971 Detailed design, consultancy   It. Lire 600 m  
  11. CONSORZIO DI BONIFICA DEL SANNIO ALIFANO - (CE)
    1. Volturno River Weir and Conduction Canal's First Reach
    Year Task Stage value of works Details
    1953-62 Design, work direction Constructed and operative It. Lire 1 b With Prof. Eng. F, Lotti
      2. Volturno's Right Bank Area Irrigation Expansion
    Year Task Stage value of works Details
    1960 Detailed design Constructed and operative It. Lire 1,2 b Irrigational area: Ha 1,100
    3. Presenzano Plain Irrigation
    Project Implementation Details:
    3.1. Lot II - including canals (1.200 Ha - Italian Lire 600 m)
    Detailed design; 1962;
    Constructed and operative.
    3.2. Lot III - sprinkling system (1.000 Ha - Italian Lire 1,5 billion)
    Detailed design - work supervision consultancy; 1962-1976
    Constructed and operative.
    4. Volturno River's Left Bank Irrigation System Construction, Expansion and Development
    4.1 - lot II - sub-lot I (distribution network).
    Detailed design; client: Cidonio contractor; 1964.
    Operative.
    4.2 - lot IV, Gioia-S. Simeone districts (600 Ha) (Italian Lire 400 m)
    Detailed design; 1968 -
    Operative.
    4.3 - lot V, Surge works for the uphill area (Italian Lire 300 m).
    Detailed design; 1969 -
    Operative,
    4.4 - lot VI, Main distribution canal upgrading (Italian Lire 300 m.)
    Detailed design and work direction; 1970
    Operative.
    5. Alifana plain uphill water management plan (Italian Lire 4 billion).
    Preliminary design; 1969
    6. Volturno river's left branches management
    Detailed design and consultancy; 1972-76
    Operative.
    7. Volturno river's left branches management (It. Lire 3,5 b.)
    Detailed design and consultancy; 1972-1976
    Operative.
  12. IN.CO.MIR spa
    Calore Irpino River Water Management Preliminary design; 1988.
  13. SOC. ENRIN 2000 - Napoli
    Hydroelectric Exploitation of Simeri, Savuto and Tronto Rivers Irrigation Canals
    Year Task Stage value of works Details
    1990-93 Feasibility design      

  14. Regione Molise
  15. CONSORZIO DI BONIFICA IN SX TRIGNO E DEL SINELLO (CH)
    1. Area Irrigation - General and Expansion Plan
    Year Task Stage value of works Details
    1951 Public works reliminary design Constructed and operative    
  16. CONSORZIO DI BONIFICA DEL BASSO MOLISE - (CB)
    2. Low Molise Irrigation, with Water Conducion from Ponte Liscio Dam
    Year Task Stage value of works Details
    1962 Preliminary design Approved, partly constructed and operative It. Lire: 13 b With Prof. Arredi and eng. Scalfati. Irrigational area: Ha 20,000

  17. Regione Puglia
  18. CASSA PER IL MEZZOGIORNO - P.S. 14
    1) Sinni Aqueduct Support Sructures
    Year Task Stage value of works Details
    1976 Consultancy Approved    
      2) Pertusillo Aqueduct
    Year Task Stage value of works Details
    1976 Consultancy     Consultancy for a reach of the aqueduct
      3) Sinni Basin Water Provision with Water Conduction from Sauro and Medio Agri Streams
    Project implementation details:
    3.1. Hydrological studies (streams Sauro and Medio Agri)
    Preliminary design for Soc. SPEA; 1979
    3.2. Detailed design of the whole plan and particularly of the intake and conduction works; works consultancy; Works direction of the reach granted to Del Favero - Maggiò group (It. L. 80 b); 1983-94
    Partially operative.

      4) Sinni aqueduct regulation work
    Year Task Stage value of works Details
    1983-86 Consultancy   It. Lire: 36 b Client: Casmez Alta Sorveglianza
      5) Sinni Aqueduct
    hydrological and hydraulic studies; 1983-84

      6) Pertusillo Irrigational Aqueduct
    Project implementation details:
    6.1. Preliminary design of Agri valley area and high Metaponto plain water supply system (4,1 mc/s) - italian Lire 100 b - 1983;
    6.2. Detailed design of lot I - It. L. 30 b - 1983
    Application accomplished. A variant model realized and granted to the designer through Consorzio Alta Val d'Agri (see A.26)
  19. ANAS COMPARTIMENTO DI BARI
    S.S. 106 Expansion - lot III
    Year Task Stage value of works Details
    1990-91 Hydraulic management Constructed and operative   Client: Impresa Castelli
  20. CONSORZIO DI BONIFICA DELL'ARNEO - NARDO' (LE)
    1. Sinni Aqueduct and Sinni-Salento Irrigation Scheme
    1.1. Sinni Aqueduct: Salento Irrigation Scheme, reach IV, 150.000 Ha, value of project It. Lire 3.100 m
    Preliminary design, with prof. V. Cotecchia; 1979-1988
    To be examined.
    1.2. Sinni aqueduct: Salento irrigation scheme, reach IV, lot I (DN 3000 mm)
    Detailed design, with prof. V. Cotecchia; 1981; It. L. 40 b
    Operative.
    1.3. Sinni aqueduct: Salento irrigation scheme, reach IV, Chidro spring surge works (2 mc/s)
    Detailed design, with the Conzorzio's technical practice; 1982; It. L. 10 b
    Operative.
    1.4. Sinni-Salento irrigation scheme, lot I (F.I.O.)
    Consultancy for the works, with prof. Cotecchia (It. L. 125 b)
    Granted to Vianini contractor, Rome.
    1.5. Sinni-Salento irrigation, lot II
    Detailed design coordination and project with others (It. L. 140 b); consultancy for Sava basin and other works; (also with Impresa Vianini as client)
    Operative.
    1.6. Sinni-Salento irrigation, lot III
    Detailed design coordination; project, with others (It. L. 150 b), consultancy
    (also with Impresa Vianini as client)
    Operative.
    1.7. Sinni aqueduct: Salento irrigation scheme, Monteparano branch point (It. L. 3 b)
    Detailed design, with Consorzio's technical practice; 1984
    Operative.
  21. ENTE IRRIGAZIONE PUGLIA E LUCANIA - (BA)
    Sinni Aqueduct: Montecotugno Dam
    Year Task Stage value of works Details
    1977-83 Work supervision Constructed and operative It. Lire 65 B - pipelines supply excluded Reach VI-V26 and Sinni-Agri; Valsinni tunnel; by pass  
  22. CONSORZIO DI BONIFICA STORNARA E TARA - (TA)
    1. Tara Area: S. Giuliano Dam Irrigation Scheme
    Year Task Stage value of works Details
    1969 Working plan Constructed and operative   Client: Impresa Della Morte
        3. Sector VII S irrigation scheme with waters supplied by Sinni aqueduct
    Year Task Stage value of works Details
    1983 Detailed design To be examined   Irrigational area: Ha 600
    1984 Preliminary design     Irrigational area: Ha 1,500
    4. Palagianello and Gennarini Ravines Drainage System
    Year Task Stage value of works Details
      Detailed design Approved It. Lire: 8 b Parcelled out in 3 lots
    5. Palagianello and Gennarini Ravines Area Management (Tara River's Outlet)
    Year Task Stage value of works Details
    1982-88 Preliminary design; hydrological study Programmatic plan approved with Law 183/89 It. Lire: 80 b  
  23. CONSORZIO DI BONIFICA CAPITANATA - (FO)
    1. Muschiatura Marsh Land Reclamation
    Year Task Stage value of works Details
    1952 Detailed design It. Lire: 100 m   With: Soc. SIAF
    2. Saccione Stream Management, lot I
    Year Task Stage value of works Details
    1960 Preliminary design   It. Lire: 1 b With: Prof. Arredi
  24. CONSORZIO DI IMPRESE METAPONTO 1 - P.S. 14 DELLA CASMEZ
    1) Metaponto Area Irrigation Network - "A" districts 1, 3, 4, Water Supplied by Sinni Aqueduct
    Year Task Stage value of works Details
    1976 Detailed design Constructed and operative   Irrigational area: Ha 4,500
    2) Tara- Stornara area irrigation scheme, "C" zone
    Year Task Stage value of works Details
    1976 Design Approved It. Lire: 36 b Irrigational area: Ha 13,500
  25. ENTE RIFORMA PUGLIA E LUCANIA - (BA)
    Taranto District Land Reclamation General Plan - Public Works
    Year Task Stage value of works Details
    1951 Preliminary design      

  26. Regione Sardegna
  27. OPERE PUBBLICHE S.p.A. (CAGLIARI)
    S. Elia Stadium's Car Park - Civil Engineering Works
    Year Task Stage Value of works Details
    1990 Detailed design Constructed and operative   Area: Ha 20 Italia '90 World Football Championship
  28. CONSORZI RIUNITI DELLA SARDEGNA MERIDIONALE - (CA)
    1. Su Pauli Land Reclamation (Villamar)
    Year Task Stage Value of works Details
    1962 Design Constructed and operative It. Lire 60 m  
    2. Villamar-Segariu Road
    Year Task Stage Value of works Details
    1966-74 Detailed design Constructed and operative It. Lire 300 m  
    3 Pula Land Reclamation and Water Management
    Year Task Stage Value of works Details
    1994 Detailed design Project included in Q.C.S. 2000-06's plan   Area: Ha 5,000  
      4. Pula area irrigation, water supplied by Monte Nieddu basin
    Year Task Stage Value of works Details
    1993-95 Design   It. Lire: 75 b Area: Ha 5,000
  29. CONSORZIO DI BONIFICA INTEGRALE LARINESE - (NU)
    1. Cigno Stream Dam
    Year Task Stage Value of works Details
    1969 Preliminary design Approved   With Scalfati, civil engineer
    1.1. Cigno Stream Dam
    Year Task Stage Value of works Details
    1978-91 Surveys, detailed design, work supervision Suspended   With Scalfati, civil engineer
      2. Anacoreta Bridge on Biferno River
    Year Task Stage Value of works Details
    1970 Detailed design, work supervision Constructed It. Lire: 700 m    
    4. Saccione Stream's Bed Management
    Year Task Stage Value of works Details
    1983-91 Detailed design      
  30. CONSORZIO DI BONIFICA DEL BASSO SULCIS - (CA)
    Sprinkler System Irrigation
    Year Task Stage Value of works Details
    1968 Detailed design Constreucted and operative It. Lire: 600 m Irrigational area: Ha 550
  31. CONSORZIO DI BONIFICA DEL CIXERRI - (CA)
    1. Irrigation Scheme of Lot 1
    Year Task Stage Value of works Details
    1965 Consultancy Constructed and operative   Irrigational area: Ha 4,500 Client: Gariazzo contractor
      2. Lot III Irrigation of Lot III with Waters Supplied by Medau Zirimilis Dam
    Year Task Stage Value of works Details
    1971 Preliminary design   It. Lire: 5,4 b Irrigational area: Ha 4,500
  32. CONSORZIO DI BONIFICA DEL CAMPIDANO DI TERRALBA (NU)
    1. Lot I: Irrigation, Land Reclamation and Roadway
    Year Task Stage Value of works Details
    1969 Work supervision Constructed and operative It. Lire: 600 m Irrigational area: Ha 600
    2. Canal Management
    Year Task Stage Value of works Details
    1970 Design, work direction Operative It. Lire: 250 m  
    3. Rio Murta Management
    Year Task Stage Value of works Details
    1970 Design, work direction Operative It. Lire: 130 m
    9. District II: Irrigation, Water Management, Roadway
    Year Task Stage Value of works Details
    1971-86 Detailed design Constructed and operative It. Lire: 29 b Area: Ha 3,500 With Scalfati, civ. Eng. and Sermonti, agronomist
    4. District II: Water Management
    Year Task Stage Value of works Details
    1975 General plan, detailed design Operative It. Lire: 5 b
  33. CONSORZIO DI BONIFICA DEL NUORESE - (NU)
    1. Cedrino valley Irrigation: Central lot
    Year Task Stage Value of works Details
    1971 Preliminary design   It. Lire: 5,5 b Irrigational area: Ha 3,000
    1.1. Cedrino valley irrigation: lots I, II
    Year Task Stage Value of works Details
    1974 Detailed design Operative It. Lire: 9 b
  34. CONSORZIO DI BONIFICA PELAU BUONCAMMINO (NU)
    1. Water Management
    Year Task Stage Value of works Details
    1967 General plan Approved It. Lire: 1,4 b
    2. Bau Enì and Su Scusorgiu Streams Management: lot I
    Year Task Stage Value of works Details
    1970 Detailed design, work supervision, book-keeping Operative It. Lire: 1 b  
    2.1. Water Management: Lot II
    Year Task Stage Value of works Details
    1972-78 Detailed design, work supervision, book-keeping Operative It. Lire: 1,6 b
    3. Rio Pardu's Left Branches Management
    Year Task Stage Value of works Details
    1974 Detailed design   It. Lire: 150 m  
    4. Rio Quirra Bridge and Roadway
    Year Task Stage Value of works Details
    1972 Detailed designs Operative It. Lire: 300 m  
    6. Rio Quirra Valley Basin Localization
    Year Task Stage Value of works Details
    1979-86 Design  
    6. Pelau River Bridge Renovation
    Year Task Stage Value of works Details
    1983-9378 Design, work direction Operative It. Lire: 1,5 b  
    7. December 1993's Flood
    Year Task Stage Value of works Details
    1994 Report      
  35. CONSORZIO DI BONIFICA DEL CAMPIDANO DI ORISTANO (OR)
    1. Oristano Area Irrigation and Networks Management
    Year Task Stage Value of works Details
    1973 Design Approved It. Lire: 26 b Prog. Spec. 13 Casmez
    2. Bennati, Babau Mattoni and S. Vero Congiu Areas Full Pipe Network
    Year Task Stage Value of works Details
    1975 Design Operative It. Lire: 13 b Irrigational area: Ha 3,000
  36. SOCIETA' BONIFICHE SARDE - ARBOREA
    Santa Vittoria Dam on Tirso River Upgrading
    Year Task Stage Value of works Details
    1972 Detailed design   It. Lire: 400 m
  37. CONSORZIO INDUSTRIALE DELLA SARDEGNA CENTRALE
    Cedrino Aqueduct Water Provision to Sologo Industrial Area
    Year Task Stage Value of works Details
    1977 Design Operative It. Lire: 6,5 b With: Tomasi, Sallusto, Coscarelli, civ. Eng.

  38. Regione Sicilia
  39. SNAMPROGETTI SUD - DATA ENGINEERING
    Porto Empedocle Industrial Port and Roadway
    Year Task Stage Value of works Details
    1989-90 Design   Town Plan on behalf of A.S.I. Agrigento
  40. CONSORZIO DI BONIFICA DELLA PIANA DI CATANIA - (CT)
    1. Catania Plain Irrigation Network
    Year Task Stage Value of works Details
    1958 Detailed design, consultancy Operative Irrigational area: Ha 3,000 Client: Impresa Cidonio
    2. Catania Plain Irrigation Network: Renovation and Espansion
    Year Task Stage Value of works Details
    1969 Consultancy Operative Irrigational area: Ha 25,000
1956 - 2024: 68 years
experience in water engineering

Complete geographical list

maritime engineering and hydroelectric plants
CESECO INTERNATIONAL s.r.l. - Professional and consulting services
Water engineering consulting firm in Rome, hydroelectric plants, dams and weirs, aqueducts and sewages
Via Lugnano in Teverina 9 - 00181 Roma | Tel.: +0039 06/7811891 | Fax: +0039 06/7801129 | e-mail: ceseco@ceseco-int.it